Joyaw Fume Extraction Arm Model KFA 2.0
The arm is specially designed for use in welding schools and other fixed location with limited space. The 3 bend positioning function enable operator to place the capture hood at correct distance and position for optimum efficiency






SMT Taiping-Perak






Gas Regulation System
SMT Batu Lancang - Penang
SMT Bentong - Pahang
Project Reference
Technical Specification
Arm Diameter: 150mm
Reach: 0.5~2.0meter
Features
Rotatable Hood
Throttle Valve
Focus Extraction Spoiler
High Pressed PVC Body
3 Bend Positioning
Smooth and High Flexibility
Made In Malaysia








SMT Kuala Lipis - Pahang
Gas Manifold System
Fume Extraction Arm in Action
Fume Extraction Arm for Chemical Fume
Solutions
Expert engineering fabrication and piping system solutions.
+6 019-886 9875
Joyaw Engineering Sdn. Bhd. 2024






No.175, Lot 1612, Block 12, MTLD,
Muara Tabuan Light Industrial Park,
Off Jalan Setia Raja, 93350 Kuching, Sarawak, Malaysia